The objective of this project it to confirm for the implementation of a fire and gas detection in terms of the location layout in the report versus site visit actual location, field junction box wiring, cable rooting and the detectors mounting report. The facility defined in terms of fire and gas system detector layout and logic functionality. This layout and functionality are developed in a way that tolerable risk targets are achieved for the facility, in accordance with PTS standards and relevant national and international standards, with respect to the fire hazards, combustible gas hazards, and toxic gas hazards.